Project Overview

This project was to provide additional class rooms for East Tilbury school by installing modular buildings.

Bul 1 reduced the ground, constructed the new pad footings for the building to founded upon. The building was connected to the foul and surface water drainage system. We constructed a parking area consisting of precast concrete kerbs and asphalt finish. The footpaths to the new modular building were constructed of precast concrete paving slabs laid on a cement/sand bed.

Location: East Tilbury School, East Tilbury
Client: Modulere – AR
Main Contractor: Richard Morris Construction
Value: £250 thousand
Programme: 16 Weeks 

Scope: 

Infrastructure works consisting of the following:

  • Concrete pad foundations
  • Drainage 
  • Kerbs
  • Footpath paving
  • Surfacing